GZR / MTR Installation

Culminating in months of preparatory work, planning and manufacturing the installation process will commence on a timeline that meets the customers’ requirements. Installation Teams work concurrently on separate tasks across the range involving the 100 meter / 200 meter / 300 meter and 100 Movers to minimise range downtime and provide parallel effort that saves […]

GZR / MTR Decommissioning

Unfortunately, even the very best equipment and software systems become worn out and obsolete. When this occurs those system components will require to be decommissioned and the way cleared to install current and state of the art components to ensure that the Range System remains fit for purpose. Decommissioning typically will encompass the sub-system components […]

GZR / MTR Civil Works & Preparation

Range configuration planning will encompass the layout of the range power and communications links that are a critical subset of the project and raise a hazard that equates to a severe risk. The risk is, there is the potential of electrocution from unidentified yet underground power sources being cut or interrupted that may not appear […]

GZR / MTR Equipment Inspections

A “Core Value” of ATS is the relentless pursuit of excellence, with that in mind a focus on the exacting standards that are required for the Marksman are also measured in the warehouse prior to being shipped to site. Items are receipted and unpacked to allow ATS Staff to carry out inspections that ensure quality […]

GZR / MTR Manufacture Fabrication

Detailed designs and planning will evolve into the manufacture, integration and fabrication of all system components (hardware / firmware / software) that constitute a GZR / MTR.  Prototypes – First Runs are critical to ensure that the accuracy and precision performance on the range are matched to the required training outcomes. First Runs will be […]